What keeps running after the room has decided
Last updated 8 September 2026
AGI²⁺ began by improving the reasoning that happens before a commitment. The runtime extends that across time. It holds what the organisation believed and why, what it committed to, what should have happened by now, what actually happened, and whether the mechanisms behind the original decision still hold.
Two loops are described on this site. The Decision Loop runs inside one decision and stops at Learning. This one does not stop.
The Persistent Institutional Loop
Fourteen stations, and the last one returns to the first
-
State
What the organisation holds as true, owed and unresolved.
Gate: the state is written down rather than assumed.
-
Objective
What the state is being reasoned about, and by when.
Gate: the objective names a decision, not a topic.
-
Hypotheses
The live explanations, including the strongest rival.
Gate: a rival explanation exists and is testable.
-
Commitments
What was agreed, who owns it, and what it predicts.
Gate: every commitment has an owner and a date.
-
Due / overdue
What falls due next, and what has passed without happening.
Gate: overdue items stay visible.
-
Monitor
The signposts, watched at their thresholds rather than at review time.
Gate: each signpost has a source and a threshold.
-
Verify
What should be observable by now, set against what is.
Gate: expected and actual are recorded separately.
-
Falsify
The search for the observation that would show a hypothesis wrong.
Gate: the falsifier was named before anyone went looking.
-
Mechanism-drift check
Whether the causal mechanism the decision relied on still operates.
Gate: drift is separated from new information.
-
Adaptation check
Whether the actors have changed behaviour in response to pressure.
Gate: a failed forecast is read four ways before one reading is chosen.
-
Replan
What changes now: the commitment, the owner, the date, or the decision itself.
Gate: the change is authorised by the people who hold the authority.
-
Score
An internal assessment of how well the state is holding up.
Gate: nothing here becomes a public number.
-
Update state
Beliefs, evidence, commitments and open uncertainty are revised in place.
Gate: what was dropped is recorded with its reason.
-
Re-anchor
The revised state becomes the authoritative starting point for the next cycle.
Gate: the next cycle begins here, not from a fresh prompt.
The fourteenth station returns to the first. What crosses that boundary is what the next cycle inherits: beliefs, evidence, unresolved uncertainty, commitments, deadlines, falsifiers, signposts, mechanism assumptions, observed adaptations and the original rationale. Not a summary of the file.
Memory and state
Why remembering is not enough
Memory answers
What happened. A model with memory can tell you what was said in March.
Institutional state answers
What remains true. What did we commit to? What should have happened by now? What actually happened? What has been falsified? What has changed? What is overdue? What must happen next?
Memory preserves the past. State governs what happens next. The difference is not the size of a context window. Institutional state is explicit and revisable, it names where each part came from, and the next cycle must start from it.
Commitments carried forward
Signposts are where this starts: an observable indicator, its source, its threshold, and the action when the threshold is crossed. The architecture carries them forward with the commitments they belong to.
For a consequential decision the runtime holds seven things per commitment:
- Commitment. What was agreed or decided.
- Owner. Who or what is responsible for it.
- Due. When it should be fulfilled or reviewed.
- Expected state. What should be observable by that point.
- Actual state. What is observed.
- Overdue. What should already have happened and has not.
- Trigger. The observation that forces reconsideration or action.
None of this is project management under another name. A task tracker asks whether the work was done. The runtime asks whether the belief behind it still stands.
What happens when reality differs from the forecast
Falsify
Mechanism drift
Adaptation
- Hypothesis failure
- Mechanism persistence
- External counterforce
- Actor adaptation
Re-anchor
Where this stands
This page describes an architecture. AGI²⁺ v26.0 is built around a testable hypothesis: that long-horizon intelligence requires more than memory, and needs persistent institutional state, explicit commitments, falsification, and the ability to detect mechanism drift and actor adaptation. No benchmark result has been established for it.
SCORE, at station 12, is internal state assessment. The runtime may score its own state. It does not score people, and it does not collapse a consequential decision into a single visible number.
The method has been demonstrated on real decisions. The system that runs it is being built through engagements, and the long-horizon stations are the part being specified rather than the part in service.